Resul Zeyrekçi, the founder and Chairman of the Board of Directors of our company, has served as a senior manager in many projects abroad and has undertaken important responsibilities in the successful completion and delivery of these projects.
Naberezhnaya Towers and Eurasia Tower
Naberezhnaya Towers (Block C) and Eurasia Tower, built by ENKA, are the only multi-storey steel carrier system business centers in the Russian Federation. Eurasia Tower, reaching 310 meters with 74 aboveground and 5 underground floors, is among the tallest buildings in Europe.
Project Highlights
- ▸During the foundation phase, over 10,000 m³ of concrete was poured uninterruptedly for 72 hours.
- ▸One piece of heavy equipment weighing 55 tons was lifted to the upper floors of the building.
- ▸More than 56 tons of electrodes were used in on-site welding operations.
- ▸The thickest steel plate used in column bases is 400 mm.
- ▸The largest box column section is 750 × 750 mm with a wall thickness of 230 mm.
- ▸The torque capacity of each bolt used in the field was checked and tested one by one.
- ▸Despite strong winds and winter conditions of up to -40 °C, the installation of steel columns continued above 200 m height (50th floor).
Engineering Details
3,000 mm thick, 10,000 m³ volume raft foundation under the tower; It rests on 1,500 mm diameter bored piles going down to a depth of 25 m and 1,200 mm diameter bored piles going down to a depth of 18 m.
Hot-rolled profiles and sheets used in steel construction were transported to Moscow by river ships.
The reinforced concrete core was constructed with a self-climbing slipform system throughout the building.